نقطة الإرتباط الكويتية لمشاريع البيئة
Kuwait National Focal Point For Environmental Projects

Remediation of damaged areas as a result of the oil lakes and oil contaminated piles , oil trenches and oil spills

This claim aims to remediate and clean up 114 km2 of desert areas contaminated by wet and dry oil lakes, which were formed by leakage from the heads of damaged oil wells and trenches that were filled with crude oil and oil-contaminated soil piles. This claim includes the following projects:

 

  1. Project of surveying oil lakes, contaminated soil piles and oil trenches for explosives and mines
  2. Project for creating landfill pits for oil - contaminated soil in North and South Kuwait
  3. Project of excavation and transport of contaminated soil in North and South Kuwait to designated landfills
  4. Soil Characterization Project in oil field areas
  5. Soil Remediation Project in Northern and Southern Kuwait using bacterial technique